Presentations by Jeff Neemann, PE
Matches: 2
EMWD?s Perris II Desalter Design Refinements: Source Water Quality/Equalization, Pre-Treatment, Phasing/Integration, and Beyond!
This paper summarizes specific challenges, considerations and solutions associated with the design of Eastern Municipal Water District?s (EMWD?s) Perris II Desalter. Topics include source water quality/equalization, pre-treatment, integration with existing facilities, phasing considerations, and RO concentrate volume minimization. The paper will pr...
GWRS Expansion with New Membranes: Design and Operational Considerations When Expanding with New Membranes to Installed Capacity
The Orange County Water District (OCWD) Groundwater Replenishment System (GWRS) has selected a new filtration membrane to implement for the GWRS final expansion from 100 mgd to 130 mgd. Presently, the GWRS facility has had a singular filtration product for the life of their facility, with an established design and standard operating procedures whic...